04-07-2017 - Black Beauty surface

Contractor has crew of 6 on site.  Placing first layer of black beauty surface treatment when I arrived. Approximately half-way across deck with first lift at 11:30. Finished placing 1st coat at 12:45. Waiting for epoxy to cure. May wait until tomorrow to place 2nd coat. Chad mentioned since he has material on site, he may put down a third coat.

Tuesday, March 21, 2017

Site Visit


 Contractor ask me to go by site and check it over, he is wanting to start pulling out equipment. Site looked good, i asked him to pick up big rock in seeded areas and check flow line of one of the ditches.


































Wednesday, March 15, 2017

Site visit Turf reinforcement mat installation 3-9-2017







8:40am- Spraying straw and seed for erosion control prior to installing the Turf Reinforcing Mat.


10:00am-Spraying is completed. Placing boundaries for turf Mat installation and installing the Mat per GRE plans and specs.



Site visit-Check pipe on north end

 Plan location for pipe on north end is not going to work, we field verified and field ajusted