3515 Barry Co Bridge CR 2100

Wednesday, March 15, 2017

Site visit-Check beams

 Was onsite today to take measurements and check beam height from beam to beam.





















Posted by Great River at 6:48 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: 2-15-2017

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Contributors

  • Great River
  • James Sutton
  • Lee
  • Shannon Shank

Blog Archive

  • ▼  2017 (9)
    • ►  April (1)
    • ▼  March (7)
      • Site Visit
      • Site visit Turf reinforcement mat installation 3-9...
      • Site visit-Check pipe on north end
      • Site visit-Check beams
      • Site visit-Set rest of beams
      • Site visit-Set beams
      • Site visit-Check rip rap placement
    • ►  January (1)
  • ►  2016 (8)
    • ►  December (7)
    • ►  November (1)
Simple theme. Powered by Blogger.